Back to projects

FAU engineering capstone

Smart Conservation System

A volunteer reporting and analytics system completed for STOP — Sea Turtle Oversight Protection as an FAU engineering capstone.

Timeline
Completed Dec 2025
Status
Completed capstone
Core stack
Power Apps · SharePoint · Power Automate · Power BI
181

Volunteer scope

Reported volunteer-program scope

Dec 2025

Project completion

Engineering capstone timeline

STOP

Project partner

Sea Turtle Oversight Protection

Project scope covers 181 volunteers. No adoption rate, time saved, reporting volume, or conservation outcome is claimed.

Problem

This FAU engineering capstone connected volunteer reporting and analytics for STOP — Sea Turtle Oversight Protection. The project covered a 181-volunteer program and was completed in December 2025; no additional adoption or outcome metric is inferred.

Responsibilities

The documented system shape combines Power Apps, SharePoint, Power Automate, and Power BI into a reporting and analytics workflow for STOP.

  • Provide a structured interface for volunteer reporting.
  • Use a shared data layer to support consistent operational records.
  • Connect workflow automation to downstream analysis and reporting.

Architecture and decisions

The Power Platform separates the workflow into four roles: Power Apps for data entry, SharePoint for stored records, Power Automate for process coordination, and Power BI for analysis. Keeping those responsibilities distinct makes the system easier to explain and avoids attributing undocumented behavior to any one tool.

Implementation

The case study focuses on the project architecture. It describes how information moves from capture to storage, automation, and analytics without publishing private partner data, internal forms, or unsupported integration details.

Testing methodology

No repository, automated test report, partner acceptance record, or deployment artifact was reviewed for this audit. The completion date, STOP partnership, and volunteer scope describe the project; no automated test or independent outcome metric is claimed.

Challenges and lessons

The architecture has to keep data definitions consistent as records pass from entry to automation and analytics. This public account avoids claiming usage frequency, time savings, partner satisfaction, or conservation outcomes because the supporting evidence was not available for review.

Engineering capstone · project overview

Project architecture and scope.

Completed in December 2025 for STOP — Sea Turtle Oversight Protection, supporting a 181-volunteer program. No independent acceptance or adoption-rate measurement is presented.

View public GitHub profile

Continue exploring

All case studies